B&Q Warehouse, North Shields

p61-03p61-02

We prepared an alternative design for the Fabricator which gave a considerable weight saving over the design proposed by the Client Engineer and enabled him to win the contract. The portal frame element contributed 90% of the steel weight but only 10% of the design effort.

Published in Commercial Property

Lindy Electronics, Thornaby

p61-01p61-04

Production Facilities and Offices.

Published in Commercial Property