Enabling Works

  

 

 

The detailed design for the Enabling Works was carried out under a design-and-build contract that enabled us to concentrate on the detailed design of the bus station structures above (see sheet 2 of 3). Construction of the bus station commenced as soon as the enabling works were complete.