%AM, %23 %538 %2015 %11:%Mar

Load Bearing Retaining Walls

 

                           

 

Beams up to 3m deep were cast to span between columns and across  the future tracks.

Lines of contiguous augered piles were connected at the top with deep concrete beams. These formed the load bearing retaining walls of  themetro station and track. The roof slab was cast across the top between the two lines of piles.